Skip to content

Busy Puslinch road to be closed for a year to through traffic

Wellington Road 34 will be inaccessible from the Hanlon until summer 2025 as the new overpass is built
hanlonconstructiondrone
Construction on the new Hanlon Expressway interchange. File photo

PUSLINCH – A major provincial construction project around the Hanlon Expressway will require a lengthy closure of a county road. 

Wellington Road 34 will be closed between Concession 7 and Wellington Road 54 to accommodate construction of a bridge going over the Hanlon on Wellington Road 34 until summer 2025. 

Wellington County roads manager Joe de Koning explained in a phone call this means Wellington Road 34 will be effectively inaccessible from the Hanlon, aside from local traffic. 

Wellington Road 54 is a new road connecting Concession 7 and the new overpass with Wellington Road 34 on the western side of the highway.

During this bridge construction, traffic will be required to use the new mid-block interchange overpass. 

This is part of the Ontario Ministry of Transportation’s improvements to Highway 6 and the 401 between Guelph and Hamilton, which is set to eventually include the long-awaited Morriston bypass.


Comments

Verified reader

If you would like to apply to become a verified commenter, please fill out this form.